More Construction Photos

41.jpg

[flagallery gid=20 name="Gallery"] Floors are ripped up.  We are replacing the back  wall with FRP to give it a shiny new look, the plan is to paint the ceiling black and the back wall black.  This will showcase the lighted cooler that we have underneath with all the new goodies in stock.  We plan on grinding the floors down and making them into a stained concrete.  Should look great when it is done.  You can see AJ working away in these pictures.